Full Pool Closing
Starting At:
- Draining the pool to the proper level
- Removing the jets, blowing the lines, installing winter plugs , and removing any deck equipment
- Winterizing all pool equipment (filter, pump(s), heater, chemical feeder, etc.)
- Super chlorinating with 10L of chlorine
- Install winter cover
Partial Pool Closing
Starting At:
- Removing the jets, blowing the lines, installing the winter plugs, and removing any deck equipment
- Winterizing all pool equipment (filter, pump(s), heater, chemical feeder, etc.)
- Super chlorinating with 10L chlorine
- Customer must drain the water level to just below the jets prior to our arrival
- If Safety Cover: must also raise all safety cover anchors prior to our arrival
- If Waterbag (Overlap) Cover: must also fill all water bags prior to our arrival
- OR
- Install own winter cover and Ultimate Pool Service will drain the water to just below the lowest jet
Equipment Shut Down
Starting At:
- Removing the jets, blowing the lines, installing winter plugs, and removing any deck equipment
- Winterizing all pool equipment (filter, pump(s), heater, chemical feeder, etc.)
- The water level must be lowered PRIOR to our arrival